Friday, November 1, 2013

berthing facility

Berthing Facilities
Berth Type Max. Permissible draft/mt Quay Length Maximum size of vessel that can be accommodated
Length DWL
V.O.C.Berth No.I Alongside 9.30 168 183* 25,000
V.O.C.Berth No.II Alongside 9.30 168 183* 40,000
V.O.C.Berth No.IIII Alongside 10.70 192 245* 50,000
V.O.C.Berth No.IV Alongside 10.80** 192 245* 50,000
Berth No.V (A.B.1) Alongside 8.60 168 183* 40,000
Berth No.VI (A.B.2) Alongside 9.30 168 245* 40,000
Berth No.VII (PSA- SICAL Container Terminal) Alongside 10.90 370 245 50,000
Berth No.VIII Alongside 12.80 345 245* 65,000
Berth No.IX Alongside 12.80 334.5 330 75,000
Shallow Berth Alongside 5.85 140 120 5000
Oil jetty Jetty 12.80 (A) 229 65,000
Coal jetty-I Jetty 12.80 (B) 225 50,000
Coal jetty -II Jetty 12.80 (C) 225 60,000
Zone - B Can also handle sailing vessels and barges and small vessels 3.00
Note
(6)Tankers of less than 150 M will not be berthed at Oil Jetty.
(5)(C)Distance between dolphins at extreme ends - 300m
(5)(C)Length of main jetty - 200m
(4)(B)Distance between dolphins at extreme ends - 300 m
(4)(B)Length of main jetty - 185m
(3)(A)Distance between mooring dolphins at extreme ends - 340m
(3)(A)Length of service Platform - 82m
(2)**Vessels drawing in excess of 10.70 shall be berthed at during high water only.
(1)Subject to availability of space. There should be at least 15m clearance from forward and after end of the vessel for berthing and unberthing.